ICS was contracted to Alltype Engineering for the pickling and passivating treatment of all the super duplex grade stainless steel pipework within the plant. The stainless steel pipes were treated in our HF pickling bath to ASTM A380 and ASTM 967 Standard.
ICS will be closed for the Christmas and New Year period from 12pm, 22 Dec - 9 Jan 2023



