ICS was contracted to Barclays Engineering for the electropolishing of their stainless steel bar tops, stanchion posts & balustrading within the stadium. The stainless steel was cleaned, pickled & passivated to ASTM A380 and ASTM 967 Standard in our HF pickling bath & then Electropolished per ASTM B912.
ICS will be closed for the Christmas and New Year period from 12pm, 22 Dec - 9 Jan 2023


